Lower Mainland - Road Conditions

Vancouver Surrey Delta Burnaby Coquitlam Langley Abbotsford - Road Condition Reports - including Highways (1, 1a (Fraser Hwy), 7, 7b (Mary Hill bypass), 10, 11, 15 (Pacific Hwy), & 17

Events for Lower Mainland Sunshine Coast

Highway 7 Both Directions Highway 7, in both directions. Special event planned between Hurd St and Manson St for 2.6 km (Mission). Starting Fri Dec 6 at 5:00 PM PDT until Fri Dec 6 at 9:00 PM PDT. The road will be closed. Next update time Fri Dec 6 at 9:00 PM PDT. Last updated Tue Oct 8 at 6:14 PM PDT. (DBC-12547)
Highway 1 Highway 1. Bridge maintenance between Spuzzum Creek Rd and Anderson River Mainline (18 km east of Yale). Until Thu Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. Alexandre Bridge Rehabilitation is underway with a speed reduction to 50 km/h until October 31, 2019. Last updated Mon Jul 22 at 2:15 PM PDT. (DBC-10291)
Highway 1 Both Directions Highway 1, in both directions. Construction work between Exit 21: Mountain Hwy and Exit 22: Lillooet Rd (North Vancouver - District). Until Thu Jul 16, 2020 at 5:00 AM PDT. Watch for traffic control. Lane closures WB & EB 9pm-5am, including on & off-ramps Oct 15-19 / Oct 20-26 / Oct 27-Nov2 / Nov 3-9 - As Required. No lane closures 11-14th Thanksgiving holiday long weekend. NOTE: WB Hwy 1 Exit 22A Closed. Last updated Tue Oct 15 at 8:26 AM PDT. (DBC-10429)
Highway 1 Eastbound Highway 1, eastbound. Construction work between Anderson River Mainline and Thomas Rd (27 km east of Yale). Until Fri Nov 1. From 7:00 AM to 5:30 PM PDT on weekdays. Single lane alternating traffic. Last updated Sat Aug 17 at 6:01 PM PDT. (DBC-11050)
Highway 1 Eastbound Highway 1, eastbound. Construction work between Exit 170: Highway 3 and Exit 171: Highway 3; Old Hope-Princeton Highway for 0.4 km (Hope). Until Wed Oct 30. From 7:00 AM to 5:00 PM PDT daily. Please obey traffic control. Construction activities will not be taking place during statutory holidays. Last updated Thu Sep 5 at 7:07 AM PDT. (DBC-11479)
Highway 1 Both Directions Highway 1, in both directions. Maintenance between Exit 109: Yale Rd and Exit 116: Lickman Rd for 5.9 km (Chilliwack). Until Thu Oct 24 at 5:00 AM PDT. From 8:00 PM to 5:00 AM PDT on Monday, Tuesday, Wednesday and Thursday. Left lane is closed in both directions. Concrete barrier installation. Last updated Wed Sep 25 at 6:41 PM PDT. (DBC-12187)
Highway 1 Eastbound Highway 1, eastbound. Tree pruning between Exit 138: Bridal Falls Rd and Exit 160: Hunter Creek Rd for 16.6 km (5 km east of Chilliwack to 6 km west of Hope). Until Wed Oct 30. From 9:00 AM to 5:00 PM PDT on weekdays. Right lane closed. Last updated Thu Oct 3 at 1:29 PM PDT. (DBC-12392)
Highway 1 Both Directions Highway 1, in both directions. Utility work between Wallace St and 1st Ave for 40.2 km (15 km east of Yale to Hope). Until Thu Oct 31. From 7:00 AM to 5:00 PM PDT on weekdays. From Hope to Spuzzum. Last updated Fri Oct 4 at 1:39 PM PDT. (DBC-12429)
Highway 1 Westbound Highway 1, westbound. Utility work planned between Albert St and Princess St for 0.3 km (Yale). Starting Mon Oct 28 at 9:00 AM PDT until Mon Nov 11 at 5:00 PM PDT. From 9:00 AM to 5:00 PM PDT daily. Right lane will be closed. For pole transfer and removal. Last updated Mon Oct 7 at 4:30 PM PDT. (DBC-12501)
Highway 1 Eastbound Highway 1, eastbound. Electrical maintenance between Exit 73 and Exit 123: Prest Rd for 49.2 km (Chilliwack to Langley - District). Until Sat Nov 30 at 5:00 AM PDT. From 9:00 PM to 5:00 AM PDT daily. Shoulder maintenance. Last updated Tue Oct 15 at 1:42 PM PDT. (DBC-12683)
Highway 1 Westbound Highway 1, westbound. Electrical maintenance planned between Thomas Rd and Toll Rd for 32.1 km (Yale). Starting Tue Oct 22 until Wed Oct 23. From 8:00 AM to 6:00 PM PDT on Tuesday and Wednesday. Right lane will be closed. Last updated Tue Oct 15 at 2:55 PM PDT. (DBC-12685)
Highway 1 Both Directions Highway 1, in both directions. Utility work planned between Boston Bar Station Rd and Jackass Summit for 23.9 km (26 to 2 km west of Jackass Mountain Summit). Starting Mon Oct 28 at 8:00 AM PDT until Fri Nov 15 at 4:00 PM PDT. From 8:00 AM to 4:00 PM PDT on weekdays. Last updated Fri Oct 18 at 7:24 PM PDT. (DBC-12808)
Highway 10 Eastbound Highway 10, eastbound. Construction work between 182 St and 184 St for 0.4 km (Surrey). Until Thu Oct 31 at 5:00 AM PDT. From 10:00 AM to 1:00 PM PDT and from 7:00 PM to 5:00 AM PDT daily. Right lane closed. Right turn lane closed. Lane closure during daytime shall be limited to once per day and thirty minutes maximum. Last updated Tue Oct 8 at 6:47 PM PDT. (DBC-12221)
Highway 10 Eastbound Highway 10, eastbound. Construction work between Panorama Dr and 160 St for 0.6 km (Surrey). Until Thu Oct 31 at 5:00 AM PDT. From 7:00 PM to 5:00 AM PDT and from 10:00 AM to 1:00 PM PDT daily. Right turn lane closed. Right lane closed. Lane closure during daytime shall be limited to once per day and thirty minutes maximum. Last updated Thu Sep 26 at 4:36 PM PDT. (DBC-12225)
Highway 10 Eastbound Highway 10, eastbound. Construction work between 144 St and 148 St for 0.8 km (Surrey). Until Thu Oct 31 at 5:00 AM PDT. From 10:00 AM to 1:00 PM PDT and from 7:00 PM to 5:00 AM PDT daily. Right lane closed. Right turn lane closed. Lane closure during daytime shall be limited to once per day and thirty minutes maximum. Last updated Thu Sep 26 at 4:36 PM PDT. (DBC-12226)
Highway 13 Highway 13. Road construction work between 264 St and 8 Ave (Langley - District). Until Thu Oct 31. From 7:00 AM to 7:00 PM PDT daily. Last updated Mon Jun 10 at 12:45 PM PDT. (DBC-3962)
Highway 17 Both Directions Highway 17, in both directions. Maintenance at 11100 Block of River Road in Delta. Single lane alternating traffic. The EB lane between 92A Ave. And Knudson Rd remains closed due to retaining wall washout. Expect some delays. Permanent repair work this Summer. Single Lane alternating traffic 24 hrs a day, 7 days a week for safety. Drive with caution. Contact knudson.Wallrepair@gov.Bc.Ca for updates. Last updated Mon Jul 29 at 7:10 PM PDT. (DBC-1660)
Highway 3 Both Directions Highway 3, in both directions. Bridge construction between Second Avalanche Gate and Allison Pass Summit (28 km east of Hope). Until Fri Nov 15. From 8:30 AM to 5:00 PM PDT daily. Single lane alternating traffic. Expect minor delays. At 19 Mile Creek Bridge. No wide loads allowed through work zone. Last updated Fri Sep 27 at 7:11 PM PDT. (DBC-12255)
Highway 3 Westbound Highway 3, westbound. Utility work planned between Second Avalanche Gate and Sunshine Valley for 7.1 km (17 to 25 km east of Hope). Starting Tue Oct 22 until Fri Nov 1. From 9:00 AM to 4:00 PM PDT daily. Right lane will be closed. Last updated Fri Oct 18 at 5:25 PM PDT. (DBC-12806)
Highway 5 Both Directions Highway 5, in both directions. Bridge maintenance between Exit 192 and Exit 195 (17 km south of Great Bear Snowshed). Carolin Bridge [25km N of Hope]: Traffic Pattern Changes with Construction Speed Zone in place. Watch for Crew and Equipment. Last updated Thu Oct 10 at 5:17 PM PDT. (DBC-8448)
Highway 7 Both Directions Highway 7, in both directions. Construction work between Silverdale Ave and Nelson St for 3.6 km (Mission). Until Fri Nov 29, 2019. From 9:00 AM to 3:30 PM PST daily. Expect delays. Please watch for signage and obey all traffic control personnel. Use alternate routes where available. Please note that for the duration of construction the lane widths will be 3.5m. Last updated Fri Nov 23 at 12:29 PM PST. (DBC-1593)
Highway 91 Both Directions Highway 91, in both directions. Paving operations between No 8 Rd and Exit 15 (Richmond). Until Sun Oct 27. From 9:00 AM to 5:00 PM PDT daily. Last updated Fri Sep 20 at 11:53 AM PDT. (DBC-12015)
Highway 99 Highway 99. Utility work between Sixteen Mile Creek FSR and Heliport Rd for 1.0 km (Whistler). Until Thu Nov 21 at 4:30 PM PDT. Single lane alternating traffic. Sept 4 to 12, 17 to 26, Oct 1 to 10, 15 to 24, Oct 26 to Nov 7, 12 to 21. Weekdays 8:30 am to 4:30 pm, every other weekend: 8:00 am to 4:00 pm. Last updated Wed Aug 28 at 12:05 PM PDT. (DBC-11366)
Highway 99 Northbound Highway 99, northbound. Utility work planned between Nicklaus North Blvd and Meadow Lane for 0.7 km (Whistler). Starting Tue Oct 22 at 9:00 AM PDT until Fri Oct 25 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. The outside curb lane will be blocked. Slow down and watch for crews in the area. Last updated Thu Oct 17 at 12:02 PM PDT. (DBC-12754)
Highway 99 Southbound Highway 99, southbound. Utility work planned between Whistler Way and Brio Entrance for 0.5 km (Whistler). Starting Tue Oct 22 at 9:00 AM PDT until Fri Oct 25 at 3:00 PM PDT. From 9:00 AM to 3:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Outside curb lane is blocked. Slow down and watch for crews in the area. Last updated Thu Oct 17 at 12:05 PM PDT. (DBC-12756)
Other Roads Eastbound Bridgport Road. Bridgport Road, eastbound. Construction work between No. 3 Road and Gage Road. Until Thu Nov 7 at 5:30 AM PDT. From 7:00 PM to 5:30 AM PDT on weekdays. Roadway reduced to one lane. No closures on Friday nights. No closures the day prior to, the weekend of, or the day following a long weekend. Last updated Mon Sep 30 at 11:25 AM PDT. (DBC-10500)
Other Roads Both Directions Marine Drive. Marine Drive , in both directions. Line painting between Taylor Way and Capilano Rd.. Until Fri Nov 1. From 8:00 AM to 5:00 PM PDT on weekdays. Right lane closed. Watch for traffic control. Expect delays. Also being done on Main street from Mountain Highway to Phibbs exchange. No work being done Oct 11-14th. Last updated Tue Sep 24 at 11:30 AM PDT. (DBC-12134)
Other Roads Westbound Bridgport Road. Bridgport Road, westbound. Construction work between No 3 Road and Bridgport Overpass to Sea Island in Richmond. Until Thu Oct 24 at 5:00 PM PDT. Westbound Curb lane will be closed during this time. Last updated Tue Sep 24 at 4:39 PM PDT. (DBC-12142)
Other Roads Eastbound Sea Island Way. Sea Island Way, eastbound. Construction work between Corvette Way and No 3 Road in Richmond. Until Thu Oct 24 at 5:00 PM PDT. The eastbound right turn lane will be closed during this time. Last updated Tue Sep 24 at 4:51 PM PDT. (DBC-12144)
Other Roads Both Directions Deltaport Way. Deltaport Way, in both directions. Utility work planned between Arthur Drive Loop and 53rd St overpass. Starting Tue Oct 22 at 1:00 AM PDT until Tue Oct 22 at 2:00 AM PDT. Single lane alternating traffic will be in effect. Expect delays. Last updated Fri Oct 18 at 12:33 PM PDT. (DBC-12794)
Other Roads Westbound Deltaport Way. Deltaport Way, westbound. Road construction work between Highway 17 and 57B St in Delta. Until Thu Dec 31, 2020. From 9:00 AM to 5:00 PM PDT on Saturday and from 7:00 AM to 7:00 PM PDT on weekdays. Watch for crews, expect minor delays. Last updated Sun Jun 2 at 4:47 PM PDT. (DBC-8881)

Highway 99 (Oak Street Bridge)

Webcam Image: Oak St. 70th/N

Oak St. 70th/N

Oak at 70th Ave., North Approach to Oak Street Bridge, looking north on Oak Street.
Webcam Image: Oak St. 70th/S

Oak St. 70th/S

Oak at 70th Ave., North Approach to Oak Street Bridge, looking south to the bridge.
Webcam Image: Shell Road

Shell Road

South approach to Oak St Bridge, looking north. Hwy 99 Northbound at Shell Rd.

Highway 99 (George Massey Tunnel)

Webcam Image: Works Yard

Works Yard

Hwy 99 at Delta Works Yard, looking north.
Webcam Image: Hwy 17 Overpass

Hwy 17 Overpass

Hwy 99 from Hwy 17 overpass, looking north.
Blundell

Looking south between Blundell overpass and Steveston offramp.
Webcam Image: South Approach

South Approach

Hwy 99, north of Hwy 17 overpass, looking north.
 
Webcam Image: Deas

Deas

Hwy 99 from north of Hwy 17 overpass, looking north.
Webcam Image: Steveston

Steveston

Hwy 99, looking north from Steveston interchange.